New ISOLCELL Turn-key project in Switzerland

For the 2023 season Isolcell completed this project consisting of 15 new CA rooms with the capacity of adding another 4 rooms in the future.
11 rooms are CA rooms for APPLE storage and the other 4 rooms are multi-purpose rooms for the fast-cooling and CA storage of berries. As well as the state of the art CA equipment for 15 rooms we also supplied Insulation panels, guard-rails, gastightness material, CA doors, humidification and digital pressure control system for this project. The equipment installed uses our patented technology to maintain the lowest possible CO2 values for the apple storage as well as a N2 generation system for RAPID PULL DOWN.

Isolcell also designed and delivered a CO2/glycol refrigeration system to allow for the best long term storage conditions.
On top of this the latest technology in gas analysis and injection was installed for the high CO2 storage of berries. A double central analyser giving the operator both control and backup in the CA and machine rooms was also provided.

Share this post

You might also be interested in...

Introducing NOVOTECH our trusted partner in Australia

Over a decade of collaboration and over 100+ customers have made Isolcell and Novotech the driving force in ensuring customers are provided with leading edge storage technology and best of breed installation and after-sales support.

Our Latest Milestone at Tobi Seeobst AG, Switzerland! 

Thrilled to Share Our Latest Milestone at Tobi Seeobst AG, Switzerland!
We are excited to announce the successful completion of our latest project: 25 state-of-the-art storage rooms designed for the optimal preservation of 4,400 tons of premium apples. 🍏